Project ownership

Anticipate budget overruns

Your contract documents, change orders, progress claims, correspondence, and acceptance reports become a cross-referenced knowledge base. Your budget is recalculated directly from contractual documents.

Request a Demo

The problem

Every stakeholder controls their scope. Nobody cross-references the whole.

1

The tender documents contain contradictions that nobody has time to cross-check trade by trade

The tender package for an 11-trade project comprises several hundred documents: specifications per trade, contract conditions, drawings, bill of quantities. Each document is internally consistent. What escapes is the systematic cross-check: an HVAC prescription incompatible with an electrical trade requirement, an unaddressed interface between two trades, a contract deadline contradicting the schedule. This exhaustive cross-referencing exceeds the manual verification capacity of any stakeholder. Contradictions not detected at tender become change orders during execution, with a resolution cost 3 to 10 times higher.

2

Your estimated final cost relies on manual consolidation, not on the documents

Original contracts, signed change orders, approved progress claims, price revisions, potential penalties. In practice, the estimated final cost is a spreadsheet aggregating data from multiple sources: quantity surveyor, project manager, ERP. A change order under negotiation whose financial impact appears only in an email exchange, a misapplied price revision, a progress claim using conditions from the previous change order instead of the current one: the budget drifts without signal. You present it to the investment committee. 66% of construction projects exceed their initial budget.

3

At handover, your deficiency items are linked to neither the specifications nor the deadlines

Pre-acceptance inspections generate hundreds of deficiency items on an 11-trade project. Each should trace to a specification, an execution drawing, a trade, a responsible contractor. In practice, they are scattered across reports with no link to the contract. Resolution tracking is done in a spreadsheet. One year after handover, the defects liability period expires. Unresolved deficiencies, unreported defects, unreleased retention sums: the cost is paid after delivery.

What you get

Documented control, from tender to final completion

1

Tender contradictions identified before contract award

Astora structures the tender package: specifications trade by trade, contract conditions, drawings, bill of quantities. Every prescription is cross-referenced against other trades. Unaddressed HVAC/electrical interface, prescribed material in one trade incompatible with another trade's requirement, contract deadline contradicting the schedule: discrepancies are flagged with source and affected trades. You award contracts on a verified basis.

2

An estimated final cost recalculated from contractual documents

Contracts, change orders, progress claims, price revisions, ancillary works: Astora recalculates the budget trade by trade from contractual documents. Unprovisioned change order, out-of-period revision, progress claim on prior change order terms: every discrepancy is flagged automatically with amount and source. The budget updates with each new document. You see the drift before the committee.

3

Every change order linked to the document that triggered it

Change order 8 invokes unforeseen ground conditions. But the geotechnical report from the design phase mentioned the risk. Change order 12 invokes a program modification. But the only trace of the decision is an email, never formalized. Astora links each change order to the correspondence, meeting minutes, work orders, emails, and studies that justify or contradict it. The link between the triggering event and the signed change order is formalized and sourced. You approve on documented facts.

4

Deficiency items linked to the contract, deadlines monitored through final account

Every deficiency item is linked to the specification it concerns, the trade, the execution drawing, and the responsible contractor. Resolution is tracked against contractual deadlines. The alert arrives before the defects liability period expires. The final account per trade is cross-referenced against contractual commitments: original contract, change orders, approved progress claims, penalties, retention sums.

Deployment

Concrete results from the first deployment

On a EUR 45M commercial construction project (11 trades, 22 months), Astora structured 2,200 documents from tender to handover. 12 inter-trade contradictions identified at tender before award. EUR 1.2M variance between the consolidated budget and the budget recalculated from documents. 5 out of 28 change orders without documented justification (EUR 380K cumulative).

12 inter-trade

Tender contradictions

EUR 1.2M between documents

Estimated final cost variance

450 prescriptions

Deficiency items

Beyond structuring

What your project data reveals about your owner-side management

Variance between manual consolidation and document-based budget

Month by month, the gap between the budget consolidated in your spreadsheets and the budget recalculated from contractual documents. You identify when and where consolidation diverges from documentary reality.

Justified change order rate by trade and by cause

Unforeseen conditions, program modification, design error: what proportion for each cause? The trades generating the most undocumented change orders become visible.

Drift anticipation by project type

On this contract type, technical trades concentrate an average of 35% of change orders. This project is at 42%. Drift patterns detected on previous projects feed predictive alerts on current ones.

Defects liability and retention sum tracking

Unresolved deficiencies by trade and by contractor. Time remaining before defects liability period expiration. Retention sums to release. Post-handover risk is monitored continuously.

Integration

No change to your workflows

Every project stakeholder continues to deposit documents in the DMS and email. You find discrepancies and the recalculated budget in your management tools, without manual consolidation.

Your systems

Project DMS Email ERP / Financial tool Collaboration platform

What Astora feeds

Owner dashboards Committee reporting Final account file AI Agents