Project execution

Manage execution on a reliable contractual baseline

Astora structures your execution documents, cross-references them against the contractual baseline, and flags discrepancies as they appear. No more manual reconstruction.

Request a Demo

The problem

Thousands of execution documents. Nobody cross-references them.

1

The contractual baseline drifts without anyone consolidating

Change order 3 modifies the scope of trade 7. The February work order changes a deadline. The March correspondence contests it. Each document is read individually. Nobody maintains the consolidated view of contract + change orders + work orders + correspondence. The site engineer manages on a version that is no longer current. The discrepancy surfaces at the final account, when the cost of correction is at its peak.

2

Every document is stored. None is linked to the others.

The DMS files documents. The ERP processes financial flows. The schedule plans tasks. None of these tools knows that change order 4 modifies trade 7, that the March progress claim still applies terms from the previous change order, or that a letter contests a modification confirmed in the meeting minutes. Cross-referencing across 14 trades, 18 months of documents, and dozens of stakeholders remains mental, manual, and incomplete.

3

Discrepancies become visible when it is too late to act

A 2-week delay on a critical trade only appears in the next meeting minutes. By then, the impact on the critical path is already locked in. A progress claim applies expired pricing conditions. It is detected during the annual audit. The information existed in the documents. Nobody cross-referenced it in time.

What you get

A living contractual baseline, from the first work order to the final account

1

A contractual baseline that evolves with the project

Every change order, work order, and correspondence is automatically integrated into the knowledge base. When change order 3 modifies trade 7, Astora recalculates impacts on progress claims, obligations, and deadlines. The team works on the latest consolidated version, not the original contract.

2

Discrepancies detected before they become costly

Astora continuously compares the actual project state (meeting minutes, progress claims, correspondence) against the contractual baseline. Deadline variance, scope change not carried forward, threshold exceeded: the alert is immediate, sourced, and quantified. The construction manager decides on facts, not on the next meeting report.

3

The factual timeline of each trade reconstructed

Who wrote what, when, in which document, in response to what. Every decision, modification, and dispute is traced and linked to the relevant trades and obligations. The construction manager accesses the complete history of a trade without manual reconstruction. A new site engineer picks up context in one hour, not two weeks.

4

Progress claims verified against contractual commitments

Each monthly progress claim is cross-referenced against applicable conditions: latest change order pricing, contractual thresholds, current deadlines. Expired pricing condition, unapplied revision, threshold exceeded without triggering: the discrepancy is flagged before approval. Across 14 trades and 18 months, verification becomes systematic instead of sampling-based.

Deployment

Concrete results from the first deployment

On a EUR 35M commercial building project (14 trades, 18 months of execution), Astora processed 6,000+ operational resources continuously. 12 significant contractual discrepancies detected within the first 6 weeks, including 3 change orders not reflected in progress claims (estimated cumulative variance: EUR 240K). The timeline for each trade is accessible without manual reconstruction.

6,000+ continuously over 18 months

Operational resources processed

12 in 6 wks, EUR 240K gap

Contractual discrepancies detected

Instant vs. 2-5 days per trade

Timeline reconstruction

Beyond structuring

What your execution data reveals about your processes

Actual vs. planned timeline

Reconstruct the actual progression of each trade: effective durations, exchanges, decisions. Variances against the contractual schedule become visible before the next meeting minutes.

Recurring drift patterns

This project vs. the previous 10 on the same contract type. Which trades systematically overrun? Which subcontractors generate the most discrepancies? Trends become actionable.

Cross-project financial monitoring

Change order rates, progress claim variances, estimated final cost fed by structured data. The forecast at completion relies on actuals, not on manual entries.

Data-driven lessons learned

Every meeting minutes entry, every exchange, every discrepancy is structured and linked. The end-of-project review relies on sourced facts, not on the memory of those who were there.

Integration

No change to your workflows

The site engineer continues uploading meeting minutes to the DMS. The construction manager finds discrepancies in the dashboard. No process change required.

Your systems

Site DMS Email Collaboration platform Project ERP

What Astora feeds

Dashboards Executive reporting Scheduling AI Agents

Test Astora on one of your active projects

We connect your sources. Within one week, you see the contractual discrepancies nobody was cross-referencing.