Astora structures your documents and exchanges from design to handover. Every document cross-referenced against all others, every review and alert traced.
Request a DemoThe problem
Your liability covers the entire project. Your document cross-referencing never does.
Contradictions in your tender documents become change orders you are liable for
The HVAC specification prescribes a duct route through the suspended ceiling. The electrical trade plans cable trays in the same location. The contract conditions set a deadline that contradicts the schedule. Across 15 trades, a 200-page specification, and studies from 6 engineering consultants, exhaustive cross-referencing of inter-trade prescriptions is infeasible manually. Every inconsistency undetected at design stage becomes a change order during execution. The design error engages the project manager's professional liability.
2,500 documents and thousands of exchanges over 24 months, cross-referenced by sampling
Construction drawings to review against specifications and adjacent trades. Progress claims to verify against the contract and change orders. Correspondence, alert emails, messages: contractual documents that nobody links to the project baseline. A drawing revised to revision C can invalidate an interface resolved at revision A on another trade. An alert email sent in March is linked to nothing when the incident occurs in October. The cross-referencing is mental, partial, and not reproducible.
In case of a claim against you, your defense relies on records scattered across 24 months
You reviewed 1,800 drawings, issued hundreds of observations, flagged non-conformities by email, noted deficiencies in site meeting minutes. Your decennial liability is engaged. In expert proceedings, you will be asked to reconstruct the timeline of your professional diligence. Your reviews are in the DMS, your alerts in your inbox, your observations in PDF annotations, your decisions in meeting minutes. The defense file takes weeks to assemble, with gaps.
What you get
Every review cross-referenced against the full contract base
Prescriptions cross-referenced trade by trade before tender publication
Astora structures each specification, design drawings, and engineering studies. HVAC prescriptions are cross-referenced against electrical, structural, and envelope trades. Unaddressed interface, incompatible material, contract deadline contradicting the schedule: discrepancies are flagged with source and affected trades. When an engineering consultant revises a calculation note, affected cross-references are rerun. The tender is verified against the full project base, not trade by trade.
Every construction drawing reviewed against the exhaustive contract cross-reference
An HVAC drawing arrives for review. Astora automatically cross-references it against specification prescriptions, adjacent trade drawings, referenced standards, and the coordination synthesis. Prescription not carried forward, interface not covered, material non-compliant with technical standards: the discrepancy is flagged before you sign off, with source. When a drawing is revised to revision C, all cross-references are rerun automatically, including those validated at revision A on adjacent trades.
The project baseline includes your exchanges, not just official documents
The email in which you alert the contractor about a non-compliant material. The message where the structural engineer confirms a load redistribution. The site meeting decision to postpone a trade. Astora automatically captures these exchanges from your email, dates them, and links them to the relevant trades and obligations. The project baseline builds continuously, without re-entry, from everything that circulates on the project.
A due diligence file built continuously, not reconstructed after a claim
The file builds automatically as the project progresses. Every review issued, every observation made, every alert sent, every deficiency noted in site meeting minutes is sourced and dated in the knowledge base. You reviewed that drawing on March 15 with a technical standard reservation. The contractor revised to revision C on April 2. You lifted the reservation on April 10. In case of a liability claim, the complete file of your professional diligence is exportable, without reconstruction.
Deployment
Concrete results from the first deployment
On a EUR 55M hospital project (15 technical trades, 24 months of execution, 30 stakeholders across project management, engineering, and coordination), Astora structured 2,500 contractual documents and integrated 3,200 exchanges (emails, correspondence, messages) from design through handover. The cross-analysis of tender documents identified 23 inter-trade contradictions before publication, including 7 unaddressed interfaces between technical trades. During execution, 1,800 construction drawings were cross-referenced against contract prescriptions (average review time: 45 minutes vs. 4 hours). The due diligence file built continuously covers 1,850 sourced reviews, observations, and alerts.
2,500 docs + 3,200 exchanges / 24 mo.
Documents and exchanges structured
23 inter-trade, before publication
Tender contradictions detected
45 min vs. 4h across 1,800 drawings
Review time per drawing
Beyond structuring
What your project data reveals about your practice
High-risk prescriptions and trades
Which prescription types are most often not carried forward into construction drawings? Which trades generate the most review discrepancies? By contract type and by discipline, vulnerability zones become visible before construction. The project manager focuses attention where the data justifies it.
Contractor compliance at review
Compliance rate by contractor, by trade, by document type. Stakeholders requiring closer oversight are identified. Review frequency adapts to measured performance, not to impression.
Recurring checks applied to every new document
Material compliance against trade prescriptions, drawing revision index verification against current change orders, standard interface consistency between disciplines: verifications that repeat from one document to another become systematic checks upon receipt of each document.
Discrepancy patterns capitalized across projects
The 5th hospital project benefits from discrepancies detected on the previous 4. HVAC/electrical interfaces that systematically cause issues, acoustic prescriptions regularly omitted from construction drawings, contract clauses that generate disputes: these recurrences feed checks from the design phase of the next project.
Integration
No change to your workflows
Drawings, meeting minutes, and correspondence stay in your DMS and collaboration platform. Exchanges are captured from your email. Astora cross-references everything and feeds your management tools without re-entry.
Your systems
What Astora feeds
Test Astora on one of your projects in design or execution
Send us the documents from a project. Within one week, you see the contradictions and discrepancies that manual cross-referencing did not cover.
Request a demo